Zeiss N HBO 103 Especificaciones Pagina 57

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 146
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 56
Axioskop 40 START-UP
Axioskop 40 FL Attachments and conversions Carl Zeiss
B 40-810 e 12/01 2-27
Avoid fingerprints on the burners glass parts. Where necessary, remove same immediately.
Press down spring lever (2-32/4) and insert the burner with the heat sink into lamp holder (2-32/5).
Take care to ensure you only hold the heat sink.
Slowly let go of the spring lever and release the heat sink.
The heat sink must be aligned parallel to the lamp base. To align it, press the spring lever and
turn the heat sink with the burner in the lamp holder.
Replace the lamp housing and tighten clamping screw (2-32/1). Log the number on the operational
hour counter.
The burner must be replaced after it attains its service life of 100 hours.
Vista de pagina 56
1 2 ... 52 53 54 55 56 57 58 59 60 61 62 ... 145 146

Comentarios a estos manuales

Sin comentarios